Skip to content

CI

CI #172

Triggered via schedule December 21, 2023 11:01
Status Failure
Total duration 33m 53s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: schedule
pre-commit  /  pre-commit
14s
pre-commit / pre-commit
pre-commit  /  lint-extension
2m 7s
pre-commit / lint-extension
Matrix: test-conda / test-conda
Matrix: test-pip / test-pip
Matrix: test-unit-functional-integration / test-pip
build  /  build
build / build
Fit to window
Zoom out
Zoom in

Annotations

20 errors and 1 notice
test-unit-functional-integration / test-pip (3.11, integration)
Process completed with exit code 1.
test-pip / test-pip (3.11, ~=3.0)
Process completed with exit code 1.
test-pip / test-pip (3.10, ~=3.0)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.10, ~=3.0)
Process completed with exit code 1.
test-pip / test-pip (3.9, ~=3.0)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.9, ~=3.0)
The operation was canceled.
test-pip / test-pip (3.12, ~=3.0)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.12, ~=3.0)
The operation was canceled.
test-pip / test-pip (3.x)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.x)
The operation was canceled.
test-pip / test-pip (3.x, true)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.x, true)
The operation was canceled.
test-pip / test-pip (3.x, ~=2.0)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.x, ~=2.0)
The operation was canceled.
test-pip / test-pip (3.x, true)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.x, true)
The operation was canceled.
test-pip / test-pip (3.8, ~=3.0)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.8, ~=3.0)
The operation was canceled.
test-pip / test-pip (3.x, --pre --upgrade --upgrade-strategy eager)
The job was canceled because "_3_11___3_0" failed.
test-pip / test-pip (3.x, --pre --upgrade --upgrade-strategy eager)
The operation was canceled.
🎭 Playwright Run Summary
10 passed (1.2m)