-
Notifications
You must be signed in to change notification settings - Fork 55
/
Copy path.rubocop_todo.yml
34 lines (29 loc) · 1.2 KB
/
.rubocop_todo.yml
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
# This configuration was generated by
# `rubocop --auto-gen-config`
# on 2017-12-29 15:04:25 +0000 using RuboCop version 0.52.1.
# The point is for the user to remove these configuration records
# one by one as the offenses are removed from the code base.
# Note that changes in the inspected code, or installation of new
# versions of RuboCop, may require this file to be generated again.
# Offense count: 1
Metrics/AbcSize:
Max: 19
# Offense count: 1
# Configuration parameters: CountComments.
Metrics/MethodLength:
Max: 31
# Offense count: 1
Naming/AccessorMethodName:
Exclude:
- 'spec/support/static_file_server.rb'
# Offense count: 1
# Configuration parameters: ExpectMatchingDefinition, Regex, IgnoreExecutableScripts, AllowedAcronyms.
# AllowedAcronyms: CLI, DSL, ACL, API, ASCII, CPU, CSS, DNS, EOF, GUID, HTML, HTTP, HTTPS, ID, IP, JSON, LHS, QPS, RAM, RHS, RPC, SLA, SMTP, SQL, SSH, TCP, TLS, TTL, UDP, UI, UID, UUID, URI, URL, UTF8, VM, XML, XMPP, XSRF, XSS
Naming/FileName:
Exclude:
- 'lib/critical-path-css-rails.rb'
# Offense count: 4
# Configuration parameters: AllowHeredoc, AllowURI, URISchemes, IgnoreCopDirectives, IgnoredPatterns.
# URISchemes: http, https
Metrics/LineLength:
Max: 96